Facilities Planning Information
General Information
Capital Improvement Program
CIP2 Summary
5 Year Plant Survey
2016 Daytona Campus Master Site Plan
2019 Deltona Campus Master Site Plan
Continuing Service Contracts
Architects
- DJ Design,Inc.
- Houseman Architecture, LLC
- KMF Architects
Long Range Planning
- 5-Year Survey of Need
- Master Plans
Funding
- PECO Requests
- Assisting in Grant Procurement
- Bond Requests
- Capital Improvement Plans
Design
- Design Team Selection and Coordination
- Preparation of Educational Specifications
Construction
- Selection of the Construction Management Firm or Assisting with the Bidding of Projects
- Project Management
- Close-out and Warranty
Permitting
The Facilities Planning Department serves as the College's Building Department and issues building construction permits and performs its own inspections. Other permits (St. Johns River Water Management District, Florida Fire Codes and when necessary Health Department Permits) are handled by other agencies.
While the Facilities Planning and Construction Departments at some educational entities also handle Security, Transportation, Custodial or Maintenance and repairs, these services at Daytona State College are the responsibility of other departments.
Project Information
-
Proposals and Bids "Failure to file a protest within the time prescribed in section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes."
Other Proposals & Bids can be found at the Purchasing Website.
In accordance with Daytona State College Procedure 808, it is required that all construction contractors be pre-qualified based on rules prescribed by the “State Requirements for Educational Facilities”. The process for pre-qualification of construction contractors is held once a year beginning in the month of April. The certificates issued are valid for one-year from July 1st – June 30th.
RFQu #24-018 - DeLand Building 8 Emergency Services Training Center Remodel Architect Selection
-
Public Meeting Notices Facilities Planning Advisory Council Meeting Notice (Posted 10/28/2024)
DeLand Campus Building 8 Emergency Services Training Center Remodel CM@Risk Submittal Reviews RFQu #25-002 (Posted 10/24/2024)
Daytona Aircraft Airframe & Aircraft Power Plant Mechanics New Building CM@Risk Submittal Reviews RFQu #25-001 (Posted 10/22/2024)
Daytona Campus Bldg. 330 Renovation Contractor Bid Openings ITB #25-003 (Posted 10/18/2024)
Facilities Planning Advisory Council Meeting Notice (Posted 9/3/2024)
Daytona Aircraft Airframe Mechanics & Aircraft Power Plant Mechanics Architect Presentations (Posted 8/30/2024)
DeLand Bldg. 8 Emergency Services Training Center Remodel Architect Presnetations Public Meeting Notice (Posted 8/28/2024)
DeLand Bldg. 8 Emergency Services Training Center Remodel Architect Submittal Reviews Public Meeting Notice (Posted 8/7/2024)
Daytona Aircraft Airframe Mechanics and Aircraft Power Plant Mechanics Architect submittal guidelines RFQu #24-017 (Posted 7/30/2024)
Facilities Planning Advisory Council Meeting Notice (Posted 7/29/2024)
Facilities Planning Advisory Council Meeting Notice (Posted 5/30/2024)
Facilities Planning Advisory Council Meeting Notice (Posted 4/15/2024)
Facilities Planning Advisory Council Meeting Notice (Posted 4/2/2024)
Facilities Planning Advisory Council Meeting Notice (Posted 1/31/2024)
Facilities Planning Advisory Council Meeting Notice (Posted 11/30/2023)
Facilities Planning Advisory Council Meeting Notice (Posted 10/26/23)
DeLand Campus Tactical Training Pavilion and P.T. Training Course CM@Risk Submittal Reviews RFQu #24-006 (Posted 10/25/23)
Palm Coast Campus Bldg. 1 Amphitheater Improvements CM@Risk Presentations RFQu #24-007 (Posted 10/16/23)
DeLand Campus Tactical Training Pavilion and P.T. Training Course Architect Presentations RFQu #24-005 (Posted 10/11/23)
Palm Coast Bldg. 1 Amphitheater Improvements CM@Risk Submittal Reviews – RFQu #24-007 (Posted 9/20/23)
Daytona Campus Building 330 Renovation Architect Presentations – RFQu #24-002 (Posted 9/13/23)
DeLand Campus Tactical Training Pavilion & P.T. Training Course Architect Submittal Reviews – RFQu #24-005 (Posted 9/13/23)
Daytona Campus Student Housing II CM@Risk Presentations, RFQu #24-001 (Posted 9/6/23)
Facilities Planning Advisory Council Meeting Notice (Posted 8/31/23)
Palm Coast Campus Bldg. 1 Amphitheater Improvements Architect Presentations, RFQu #24-003
Daytona Campus Student Housing II CM@Risk Submittal Reviews – RFQu #24-001
Palm Coast Campus Bldg. 1 Amphitheater Improvements Architect Submittal Reviews – RFQu #24-003 (Posted 8/9/23)
Daytona Campus Building 330 Renovation Architect Submittal Reviews RFQu #24-002 (Posted 8/2/23)
Facilities Planning Advisory Council Meeting Notice (Posted 7/27/23)
Deltona Campus Building 1 Welding Lab CM@Risk Selection Presentations/Interviews – RFQu #23-029
(Posted 7/12/23)Daytona Campus Student Housing II Architect Selection Presentations/Interviews – RFQu #23-028
(Posted 7/11/23)DOC Interviews Public Meeting Notice
(Posted 6/29/23)Daytona Campus Student Housing II Architect Submittal Reviews RFQu #23-028
(Posted 6/21/23)Delivery Order Contractors Submittal Reviews – RFQu #23-026
(Posted 6/15/23)Deltona Campus Bldg. 1 Welding Lab CM@Risk Submittal Reviews (RFQu #23-029) (Posted 6/8/23)
Facilities Planning Advisory Council Meeting Notice (Posted 5/25/23)
Facilities Planning Advisory Council Meeting Notice (Posted 4/27/23)
Deltona Campus Building 1 Welding Lab Architect Presentations (RFQ #23-021) (Posted 4/21/23)
Deltona Campus Building 1 Welding Lab Architect Submittal Reviews (RFQ #23-021) (Posted 4/5/23)
Facilities Planning Advisory Council Meeting Notice (Posted 3/30/23)
Facilities Planning Advisory Council Meeting Notice (Posted 1/26/23)
Facilities Planning Advisory Council Meeting Notice (Posted 12/16/22)
Facilities Planning Advisory Council Meeting Notice (Posted 11/23/22)
Facilities Planning Bid Opening Meeting Notice (Posted 10/04/22)
Facilities Planning Advisory Council Meeting Notice (Posted 8/02/22)
Facilities Planning Advisory Council Meeting Notice (Posted 4/28/22)
Facilities Planning Advisory Council Meeting Notice (posted 3/31/22)
Facilities Planning Advisory Council Meeting Notice Feb. 3, 2022 (Posted 1/27/2022)
Master Site Plan Professional Services Presentations Jan. 27, 2022 (Posted 1/20/2022)
Facilities Planning Council Advisory Meeting Jan. 13, 2022 (Posted 1/13/22)
Master Site Plan Professional Services Submittal Reviews (Posted on 1/3/22)
DeLand Campus Indoor Firing Range CM@RISK Presentations (Posted 11/19/21)
DeLand Campus Indoor Firing Range 2 CM@RISK Submittal Rev. (Posted 10/26/21)
DeLand Campus Indoor Firing Range Architect Presentations (Posted 9/10/21)
Daytona Campus Multi-Purpose Field Architect Presentations (Posted 9/03/21)
DeLand Campus Indoor Firing Range Architect Submittal Reviews (Posted 8/26/21)
Deltona Campus New Building 2 CM@RISK Presentations (Posted 8/24/21)
-
Current and Upcoming Current
DeLand Campus Indoor Firing Range
Architect: Architects Design Group
Contractor: Charles Perry Partners, Inc.
Anticipated Completion: 2024Multi-Purpose Field
Architect: Borrelli +Partners, Inc.
Contractor: TBD
Anticipated Completion: 2025DeLand Campus Tactical Training Pavilion, P.T. Course and Driving Pad
Architect: Spiezle Architectural Group
Contractor: Charles Perry Partners, Inc.
Anticipated Completion: 2025Flagler/ Palm Coast Amphitheater Improvements
Architect: DLR Group, Inc.
Contractor: D.E. Scorpio Group
Anticipated Completion: 2025Daytona Campus Bldg. 330 Renovation
Architect: Houseman Architecture
Contractor: TBD
Anticipated Completion: 2025Upcoming
-
Contractor Certificate of Pre-Qualification In accordance with Daytona State College Procedure 808, it is required that all construction Contractors be pre-qualified based on rules prescribed by the "State Requirements for Educational Facilities". The process for pre-qualification of General Contractors is held once a year in the month of April. The certificates issued are valid for one year from July 1st to June 30th.
Contracting firms who wish to submit proposals or bids for Daytona State College projects must hold a current Certificate of Pre-Qualification.
Applications are currently NOT being accepted for GENERAL CONTRACTORS.
PLEASE NOTE: Only one (1) email can be used to notify the firm of any RFQs, RFPs or ITBs. What some firms do is set up a distribution list email (i.e. bids@company.com) in order to add or remove emails internally to that list. That way, if someone leaves the company, the notifications are still being received.
- General Contractor Pre-Qualification Application
- General Contractor Pre-Qualification Re-Application (For GC's who currently hold a certificate)
Once received, the Contractor Pre-Qualification Committee reviews the application and makes its recommendation to the District Board of Trustees. After the Board approves the recommendation, the signed Certificate is issued.
Daytona State College Current Contractor Pre-Qualification Certificate Holders
-
Permit Process The permitting process is a responsibility of the Department of Facilities Planning and Construction.
Building and construction permits for any project that includes New Construction or Remodel, and for Renovation projects in excess of $50,000 require a permit, in accordance with Florida Statutes.
Permit applications may be obtained by contacting the Facilities Planning Department at (386) 506-4322 or via email to Sharon Dyke at Sharon.Dyke@DaytonaState.edu or from below.
Permit applications can only be made by Licensed Contractors registered in the State of Florida. When required by Law, signed and sealed plans must be provided.
Applications should include:
- Copy of current license
- Certificate of Insurance with Daytona State College listed as additional insured
- Bond (if applicable)
- 2 sets of signed/sealed drawings & specs
Facilities Planning Department
Steve Selig
Senior Facilities Planner
Facilities Planning (Building 430A), Room 108H
(386) 506-3169
Joseph Heilman
Senior Facilities Planner
Facilities Planning (Building 430A), Room 108G
(386) 506-3180
Allen Masters
Associate Vice President
Facilities Planning and Operations, (Building 430A) Room 104
(386) 506-3162
Sharon Dyke
Senior Staff Assistant
Facilities Planning (Building 430A), Room 108
(386) 506-4322
Sergio Crandall
Construction Manager
Facilities Planning (Building 430A), Room 108F
(386) 506-4401
Anthony 'Tony' Yee
Facilities Accountant
Wetherell Center (Bulilding 100), Room 313G
(386) 506-4315